Glory Hole-furnace course 2001
Shown here is a photo montage of a glory hole which was built in July 2001 by our class of 4.
preparing the fibre by creasing it before laying it in the barrell.
cutting the barrell down to size.
cutting the role of fibre into 3 equal parts.
coiling the fibre into place.
teamwork to add the coils
packing the fibre into place.
finished coils....
casting the rim...
the finished casting...
adding the burner ports...
firing it up...

Home/Contact Us/ Galleries

the finished product, using old fibre doors...